3 900,00 zł (netto)
4 797,00 zł (brutto)
2 in stock
Obliczenia w kalkulatorze są orientacyjne. Bank
przygotuje dla Ciebie ostateczną ofertę, kiedy złożysz wniosek ratalny.
Wastewater treated in the biological treatment plant flows to the pumping station tank. When the float in the Pedrollo TOP1 pump rises, the pump starts. The treated wastewater is pumped to the sprinklers, which discharge it onto the ground. The infiltrating wastewater is re-treated in the root zone layer of plants, and the perforated DN110 pipe allows for even distribution of liquid throughout the bed. DN50 pipes are laid with a slope toward the pumping station.
– Pump station 1500mm/250L with Pedrollo TOP1 pump and cover – 1 pc.
– GWF sprinklers in selected color (gray, green or brown) – 10 pcs.
– PP DN50 pipe 2m – 12 pcs.
– PP DN50 elbow 87° – 1 pc.
– PP DN110 pipe 2m perforated – 11 pcs.
– PP DN50 tee 87° – 9 pcs.
© Xymen 2023. Wszelkie prawa zastrzeżone
Projekt i realizacja: www.wertui.pl