51,00 zł (netto)
62,73 zł (brutto)
2 in stock
Obliczenia w kalkulatorze są orientacyjne. Bank
przygotuje dla Ciebie ostateczną ofertę, kiedy złożysz wniosek ratalny.
Brackets available in colors: green, gray, brown.
To build the system, a treatment plant with integrated pumping station or external treated wastewater pumping station is required
Wastewater treated in the biological treatment plant flows to the pumping station tank. When the float in the Pedrollo TOP1 pump rises, the pump starts. The treated wastewater is pumped to the sprinklers, which discharge it onto the ground. The infiltrating wastewater is re-treated in the root zone layer of plants, and the perforated DN110 pipe allows for even distribution of liquid throughout the bed. DN50 pipes are laid with a slope toward the pumping station.
© Xymen 2023. Wszelkie prawa zastrzeżone
Projekt i realizacja: www.wertui.pl