14 884,00 zł (netto)
18 307,32 zł (brutto)
2 in stock
The calculations in the calculator are approximate. The bank will prepare a final offer for you once you submit your installment application.

Parameters
| ZBS-10C
|
| Population equivalent (PE) | 10 |
| Daily wastewater flow (m3/day) | 1.5 |
| Daily pollutant load (kg BOD5/day) | 0.60 |
| Width (mm) | 1200 |
| Total length (mm) | 3500 |
| Height (mm) | 1600 |
| Standard outlet depth (mm) | 1400 |
| Inlet height from tank bottom (mm) | 1360 |
| Pipe diameter (mm) | 110/160 |
| Approximate sludge storage period | 12 months |
| Electrical supply | 230 V |
| Blower power | 80 W |
| Weight of standard unit (tonnes) | 0.220 |
– Primary settling tank: raw wastewater enters here first. Fats are retained, solids are separated and settle to form sludge. The pre-treated wastewater is then transferred to the reactor by an airlift pump.
– Intensive aeration, which takes place for most of the cycle, supports the growth of aerobic bacteria and wastewater treatment.
– A settling phase, during which bacteria concentrated in the activated sludge settle at the bottom of the reactor.
– Pumping treated wastewater out of the reactor is the penultimate stage of the process.
– Sludge return by means of an airlift pump refreshes the wastewater in the settling tank and reduces the amount of sludge in the reactor.

Monolithic tank with primary settling tank and SBR biological reactor
DN600 tank covers (2 pcs.)
Technical enclosure with control system
Installation throughout Poland by professional installation teams – arranged individually.
Have questions? Call us and we will help you choose the best solution for your needs.